T/RK089/24 - Fusion Futures: Development of a Gyrotron Cavity Test Rig

Below you find information regarding this tender. To be able to work on a response for the buyer you have to be registered and logged in.

The objective of this work package is to develop a test rig design for testing prototype gyrotron cavities simulating the: • Internal thermal load and associated cooling efficiency • Pressure forces • Vacuum compatibility The test rig would include a thermal head that is inserted into prototype cavities to mimic the induced ohmic loads from the cavity electric field profile. The head could be designed for a specific gyrotron cavity, but the concept adaptable to cavities with diameters in the range of 30 to 50mm, and cavity length 20 to 30mm. Ideally, the thermal profile would be close to consistent with the E-field’s power deposition profile and capable of power densities exceeding 30MW/m2. The test rig should include simplified interfaces for easy replacement of the cavity, while ensuring safe testing conditions. The estimated budget for this is between £80,000 and £100,000. This piece of work is required to be completed by March 2025, it is anticipated that this contract will be 8 months long.

Services

05/07/2024 16:30:00

71320000-7  Engineering design services
79415200-8  Design consultancy services
79930000-2  Specialty design services


United Kingdom Atomic Energy Authority
Culham Campus
OX14 3DB
Abingdon
United Kingdom
View profile


http://www.gov.uk/government/organisations/uk-atomic-energy-authority

Published notices
Prior information notice (FTS)
Lots
Fusion Futures: Development of a Gyrotron Cavity Test Rig
Additional information:
Documents Documents
Close